Projects

2021 WGL 2-50 Baveria

On the GOETZ - AREAL, at the border to Upper Franconia and the Upper Palatinate, a highly efficient high-tech plant is to be built, which is also designed as a reference object with connected development facilities.

... read more

1998 Pilot plant/pre-series plant

With the start of the project in 1998 and the construction of the first SGL plant of TCP Energies GmbH & Co. KG on an industrial scale (1:1), a new technological solution approach was developed based on modified thermolysis with direct coupling of gasification.

The basis was the building permit for the erection of a multi-chamber thermolysis plant "PR 450 Technikum".

... read more