About
The company, located in Jena/Germany, is active in the field of project engineering of plants and applies for patents. The managing director of TCP Energies GmbH & Co. KG is Dr. Ing. Hartwig Streitenberger, the inventor of a process for the gasification of high-calorific organic waste, which is protected by several international patents.
We're hiring!
Our portfolio
The object of the company is the provision of technical and technological development services
- for machines, apparatus and equipment for the thermal treatment of organic waste and diversified gasification plants together with the integration of necessary peripheral technology and specific process solutions,
- on other projects and solutions in the fields of waste treatment and recycling and combined heat and power (CHP),
- for process control, automation, backup, monitoring and remote maintenance of corresponding equipment,
- as well as the manufacture, sale, installation and operation of these technical systems, including related project planning, design and other services.
Numbers and data
Power generation
per line
Total efficiency
from input material to electricity and heat
Research and development costs
Example Energy power plant Brand GmbH
History
2022
8. June 2022
Start of implementation phase UpCycling power plant Brand
2021
7. April 2021
Project advance WGL 2-50 EW Fire
2018
21. March 2018
Patent granted for the Duplex TEC process
2017
10. May 2017
Development of the Waste Gasification Line (WGL®)
2016
21. March 2016
Foundation of TCP Energies GmbH & Co. KG
2015
21. March 2015
Foundation of SOWA Engineering GmbH
2013
21. March 2013
Marketing of the SGL modular synthesis gas plant series
2011
21. March 2011
End of long-term testing of the first synthesis gas plant (pre-series plant)
2009 – 2010
21. March 2009
Increase of the passage capacity as well as the gas quality by addition of pure oxygen
2005 – 2008
10. March 2005
Optimization of waste processing to reduce apparatus contamination and optimization of functionality in continuous operation
2003 – 2004
21. March 2003
Optimization of waste preparation and drying as well as process stability
2000 – 2002
21. March 2002
Commissioning and expansion of the newly developed synthesis gas plant