The company, located in Jena/Germany, is active in the field of project engineering of plants and applies for patents. The managing director of TCP Energies GmbH & Co. KG is Dr. Ing. Hartwig Streitenberger, the inventor of a process for the gasification of high-calorific organic waste, which is protected by several international patents.

We're hiring!

Project Engineer Electrical Engineering (m/f/d)

... read more

Design engineer specializing in mechanical engineering (m/f/d)

... read more

Our portfolio

The object of the company is the provision of technical and technological development services

  • for machines, apparatus and equipment for the thermal treatment of organic waste and diversified gasification plants together with the integration of necessary peripheral technology and specific process solutions,
  • on other projects and solutions in the fields of waste treatment and recycling and combined heat and power (CHP),
  • for process control, automation, backup, monitoring and remote maintenance of corresponding equipment,
  • as well as the manufacture, sale, installation and operation of these technical systems, including related project planning, design and other services.

Numbers and data

0
MWh/h

Power generation
per line

ca 76%

Total efficiency
from input material to electricity and heat

0 Mio €
ca.

Research and development costs
Example Energy power plant Brand GmbH

History

2022

8. June 2022

Start of implementation phase UpCycling power plant Brand

2021

7. April 2021

Project advance WGL 2-50 EW Fire

2018

21. March 2018

Patent granted for the Duplex TEC process

2017

10. May 2017

Development of the Waste Gasification Line (WGL®)

2016

21. March 2016

Foundation of TCP Energies GmbH & Co. KG

2015

21. March 2015

Foundation of SOWA Engineering GmbH

2013

21. March 2013

Marketing of the SGL modular synthesis gas plant series

2011

21. March 2011

End of long-term testing of the first synthesis gas plant (pre-series plant)

2009 – 2010

21. March 2009

Increase of the passage capacity as well as the gas quality by addition of pure oxygen

2005 – 2008

10. March 2005

Optimization of waste processing to reduce apparatus contamination and optimization of functionality in continuous operation

2003 – 2004

21. March 2003

Optimization of waste preparation and drying as well as process stability

2000 – 2002

21. March 2002

Commissioning and expansion of the newly developed synthesis gas plant